Representative company scenario
120-person automotive parts plant
Maintenance requests outgrow the whiteboard
See how a growing component plant can replace paper, messages, and verbal requests with one accountable work queue.
The operating situation
Where the maintenance process starts to break down
Supervisors raise maintenance requests through paper, messages, and conversations on the floor. The maintenance manager starts each morning by determining what is urgent, who owns each job, and which items were carried over. Production can see that work was requested, but not whether it is assigned, blocked, or complete.
- The same request appears in more than one channel
- Ownership depends on who attended the morning meeting
- Overdue work is found manually
- Closure evidence is inconsistent or missing
Workflow with Corivo
From plant-floor signal to usable maintenance history
The goal is not another reporting layer. It is one connected path from the first request to completed, reusable equipment context.
- 01
Capture every request consistently
Each request enters Corivo with an asset, plant, priority, due date, description, and reporter instead of becoming an unstructured note.
- 02
Plan from one maintenance queue
The manager filters work by line, status, risk, technician, or due date and assigns jobs without rebuilding the list in a spreadsheet.
- 03
Give technicians a focused view
Technicians see assigned work, comments, checklists, parts, and status in one place. Updates become visible without another message thread.
- 04
Review work with evidence
Completed jobs retain labor, notes, timing, and closure evidence, creating a more reliable morning review and asset history.
Operational value
What this workflow makes easier to control
These are workflow outcomes the scenario is designed to support, not promised performance percentages.
- One source of truth for corrective maintenance
- Clear ownership and due dates
- Less time spent rebuilding the daily maintenance list
- A traceable record of completed and carried-over work
Try the workflow
Start with one facility and one real maintenance queue
Map equipment, print QR tags, and run live work orders for 14 days. No credit card required.
More company scenarios